Hospital Case Study

UPMC Passavant Hospital

UPMC Passavant Hospital Building

In recent years, UPMC Passavant Hospital has undergone a transformation. With a modern facility, advanced medical equipment, and a comprehensive range of health services, it has risen to be one of the top ranked hospitals in the nation.

However, with ambition, come challenges. Regulations, high demand, and the cost of failure constantly loom. When it came time to replace their heating system, they needed someone they could trust.

Wolf Engineering took control of the project. They had to provide consistency, power, affordability, and the ability to meet emissions regulations. Two ZF 4500HS Unilux Boilers seemed like they were the perfect answer, but there was a problem. The boilers were too tall.

Despite this setback, we had every intention of going forward. A little creativity goes a long way, and we managed to make some custom modifications to the rear wall flue connection, converting the boilers into the perfect fit they were hoping for. After a smooth installation, they were ready to go.

UPMC has never looked back, and the community couldn’t be more grateful. The residents know that they can rely on them for their care. Who does UPMC rely on? Well, that’s where we come in.